DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Akpınar Regulator and Hydroelectric Power Plant (HPP) Project is located on Karadere Stream within the boundaries of Yığılca District of Düzce Province in the Western Black Sea Region.
The structures included in the project consist of the following components:
| Design Discharge | 7 m3/s |
|---|---|
| Number of Units | 3 units |
| Turbine Type | Francis |
| Regulator Type | Frontal Intake |
| Regulator Height | 10 m |
© 1986-2026 Doğru Engineering | All rights reserved.
Developed by: Idesa Creative